| The brick was chosen to match the Motherhouse (in background) |
| Because of the ICF brick ledge, it looks like we'll have brick under the driveway at the garage doors |
| I wish those window wells were in already - there's mud in the basement |
| Tile field is in |
| That's gonna be an interesting corner to brick-up. |
| Metal stud framing for the basement suite. Overall, a very clean construction site. |
| Metal studs throughout, wood studs at the jambs. A bit of the chapel sloped ceiling visible. |
| Good to see the plans are still being used! :-) Pocket doors on sides, into kitchen. |
| I was glad to provide the builder a 3D rendering for his really nice sign. |