ArchiTECHS Blog




Some of the projects I've been involved in...

Monday, December 6, 2010

December visit

The heat is on indoors, and the finish guys are working as fast as they can doing everything from the oak flooring and cabinets to the tile-work and trim.  Here are some shots of today's visit...

View from Warren Road heading west toward the residence

Looking east
Hopefully we'll get some stained glass designed for the circular lite.

Stairs down to "the lower level"

We wanted to save that tree... I think we did it.

Some pea gravel missing below, but looks like it'll fit a Weber E-320 nicely.

One of the two utility rooms off the garages.

Two of the bedrooms have this view of the front door.

The other utility room.

Hope that boot bench is high enough for our tall Ugandan priests.

Ahh... the trim guys.

The kitchen gets an oak floor as well.

This bedroom has a view of the convent bell tower in the background.

Stamped concrete and some landscaping to hold back that slope... i hope.

No comments:

Post a Comment