ArchiTECHS Blog




Some of the projects I've been involved in...

Monday, December 6, 2010

December visit

The heat is on indoors, and the finish guys are working as fast as they can doing everything from the oak flooring and cabinets to the tile-work and trim.  Here are some shots of today's visit...

View from Warren Road heading west toward the residence

Looking east
Hopefully we'll get some stained glass designed for the circular lite.

Stairs down to "the lower level"

We wanted to save that tree... I think we did it.

Some pea gravel missing below, but looks like it'll fit a Weber E-320 nicely.

One of the two utility rooms off the garages.

Two of the bedrooms have this view of the front door.

The other utility room.

Hope that boot bench is high enough for our tall Ugandan priests.

Ahh... the trim guys.

The kitchen gets an oak floor as well.

This bedroom has a view of the convent bell tower in the background.

Stamped concrete and some landscaping to hold back that slope... i hope.

Thursday, October 21, 2010

Exterior brick complete

The brick-layer was a pro.  Look at that walking soldier course.
Shutters will make those expensive windows appear a bit bigger, later.
Landscaping is a separate bid.  Should be fun.

The Motherhouse can be seen in the distance.  Tree saved... so far.
Here's how that egress window corner condition was resolved. (by a pro!)
Should end up being a nice patio area. 
FYI... the brick is called: "Cob Set" (w/ no black bricks) from Brick Tech Architectural

Wednesday, September 22, 2010

The brick is here - and interior studs finished

The brick was chosen to match the Motherhouse (in background)
Because of the ICF brick ledge, it looks like we'll have brick under the driveway at the garage doors
I wish those window wells were in already - there's mud in the basement
Tile field is in
That's gonna be an interesting corner to brick-up.
Metal stud framing for the basement suite.  Overall, a very clean construction site.
Metal studs throughout, wood studs at the jambs.  A bit of the chapel sloped ceiling visible.
Good to see the plans are still being used!   :-)     Pocket doors on sides, into kitchen.
I was glad to provide the builder a 3D rendering for his really nice sign.

Wednesday, September 8, 2010

The windows are in, the roof is done

Made it out to the site this past, beautiful, Tuesday.  The windows end up being the ($1000 ea.) Pella type.  Great windows for a super energy-efficient house.  The inside space is fun to be in - no interior walls yet, just one big 3,400 square foot room!

View from the Motherhouse
 
View from the SE
Do not use this door, go around...
Ceiling framing, above the entry, in place
No interior walls yet - you won't see a house this way too often.
Dining area windows!
Basement lookng SE.  Yes, that'll be an overhead door for the lawn tractor (not a Harley)

Thursday, August 26, 2010

A site visit to the Dominican Sisters of Mary, Mother of the Eucharist Priests' Residence

I finally visited the site today, after a long time away.  It was exciting to see the progress, and to actually "feel" the size of the residence (as opposed to "virtually" feeling it while using BIM software during the planning process)

North Elevation
Southeast corner


South Elevation
Main entry looking north
The beginnings of a "front" door...
...and who would YOU hire to frame-out a priests' residence?
 Feel free to comment below.  I'm happy to expound on anything that any viewer of this blog asks about.